Group 1 finishing works in Pier No. 3,4 and 5 were completed on time by our company by making no concessions to quality and speed. These blocks that found great coverage in media were completed thanks to coordinating various different parts manufactured within a short period of time according to work sequence.

Scope of Pier Building Construction:

  • Gas Concrete Wall Manufacturing with Ferroconcrete Beam (7.233,13 m - 13.057,39 m2)
  • Cement Based Machinery Plaster (37.782,55 m2)
  • Mechanical Plastering (18.557,37 m2)
  • Constructive and Structural Steel Manufacturing (624.501,47 kg)
  • Multipurpose (Carrier, Reinforcement, Coating etc.) Tubular Steel and Rolling Mill Works (619.925,61 kg)
  • Alçıpan Wall (Partition, Cladding, Installation etc.) Manufacturing (44.517 m2)
  • Boardex/Guardex Manufacturing in Exterior – Installation Areas (2376 m2)
  • Betopan Panel Application in Lift Volume Rendering
  • Sanitaryware reinforcement with Waterproof Plywood (853,80 m2)          
  • Fireboard Applications in Areas with Fire Insulation (6920,45 m2)
  • Sandwich panel manufacturing in volume rendering (2193,72 m2)
  • Supporting Steel Construction Manufacturing for Service Areas Inside Buildings
  • Steel Construction of Façade Covering of the Whole Structure in Flbs (446.853,81 kg)
  • Cement finish for all floors and blocks (Double mat / With Hand bended Iron trestle / Canted / Of 10 - 25 Cm Variable Heights) (97.486,71 m2)
  • Artificial Stone Cladding in Stairs and Technical Areas (1494,83 mt)
  • Granite covering in passenger areas, plinth, (90*90*3 Cm) and Stairs, 120*120 Cm Ceramic Covering and Plinths (44.250,18 m2)
  • Jacketing Package (Insulation + Plaster Net + Joint Gap+ Dilatation Profiles + Decorative Paint) Manufacturing (10.711 m2)
  • Many other works within the building such as flower pot manufacturing and installation with special acrylic paint in waiting areas and tree plantation (15 adet)
  • Scaffold provision and installation works (83.925,65)                                          
  • Painting (63.585,48)          